At Dexed Home, the construction process takes 90 business days from the moment work begins on-site.
Contact our advisor for promotional pricing!
> DEX 136
26,68 m x 18,98 m
> DEX 106
24,38 m x 18,78 m
> DEX 76
21,88 m x 16,93 m
The plot must be designated for residential construction per the Local Development Plan. If such a plan does not exist, a zoning decision must be obtained.
Solar roof, hybrid inverter, energy storage, heat pump, and mechanical ventilation with heat recovery.
- Structural walls: Prefabricated reinforced concrete (15 cm thick)
- Interior walls: Lightweight steel frames covered with gypsum boards
Yes, we provide a monolithic foundation slab. Geotechnical surveys and ground preparation are the client's responsibility.
Underfloor heating combined with air exchange via heat recovery ventilation ensures optimal comfort and efficiency.
The layout of interior walls is fixed and cannot be changed. The only option is to mirror the house’s design. After receiving the keys, the homeowner may introduce changes, but Dexed Home does not provide warranties on modified elements.
© Copyright 2025 -DexedHome.en